A wholesale kitchen sink MOQ of 50 pieces is the starting point for a factory-direct order from Yalan Sink. Samples take 5–7 days, and a confirmed bulk order takes 25–30 days to produce. This guide explains what the 50-piece minimum covers, how buyers mix models inside one order, and how to plan a first order without delays.
What a Wholesale Kitchen Sink MOQ of 50 Pieces Means
MOQ stands for minimum order quantity: the smallest order a factory accepts for one production run. At Yalan Sink, the wholesale kitchen sink MOQ is 50 pieces per order, for sinks and faucets alike.
The number exists for a practical reason. Every production run carries setup work — cutting SUS304 steel, forming and welding each bowl, brushing the finish, inspecting, and packing. Spreading that setup across 50 pieces keeps the run efficient. Below that volume, the same setup serves fewer units, and the run stops making sense for either side.
For buyers, 50 pieces is a manageable first commitment. A wholesaler can trial a new model without filling a warehouse. A brand owner can run a first private-label batch and test it with real customers. A project buyer can cover a small hotel floor or an apartment block in a single order. And because Yalan Sink runs a 50,000 sqm factory with an annual capacity of 3,100,000 pieces, a 50-piece order fits into normal production without a long wait for a slot.
Can You Mix Models in One 50-Piece Order?

Yes. The 50-piece minimum counts the order total, not a single model. A buyer can combine sinks and faucets, sizes, and finishes inside one order — for example, 20 pieces of a 304 stainless steel kitchen sink, 15 pieces of a gold single-bowl undermount sink, and 15 pieces of a black double sink add up to exactly 50.
Faucets can join the same order as well. A black pull-down rotating kitchen faucet or a single-handle kitchen faucet ordered alongside the sinks ships as part of the same 50-piece commitment, which is useful when a buyer is kitting out a kitchen range rather than buying sinks alone.
One practical limit applies: keep a 50-piece order to two to four models. Each model still needs its own setup — its own forming, welding, and finishing pass — so splitting a small order across too many models adds time and complexity. A focused mix also makes inspection and packing simpler at the factory end.
If a model needs a custom size or a non-standard specification, confirm it with the factory before counting it into the order. Custom work follows its own confirmation steps, and it is better to settle those details before production is scheduled than after it starts.
Samples First: What 5–7 Days Gets You
Before committing to 50 pieces, order a sample. Yalan Sink produces samples in 5–7 days, and a sample is the cheapest way to remove risk from a first order.

A sample lets a buyer check exactly what the bulk order will deliver: the SUS304 material, the chosen thickness — 0.7, 1.0, 1.2 or 1.5 mm — the brushed finish, the quality of the handmade welds, the bowl depth, and the drain fitting. Dimensions can be measured against the project drawings, and the finish can be checked under real light rather than judged from a photo.
Treat the sample as the reference for the whole order. Compare it with the specification sheet, test-fit it if a countertop cutout is involved, and confirm the thickness and finish in writing before bulk production begins. A sample approved on time keeps the 25–30 day bulk clock running on schedule; a sample approved late pushes everything back by the same number of days.
Bulk Lead Time: Why 25–30 Days Is the Realistic Window
Once the sample is approved and the order is confirmed, bulk production takes 25–30 days. That window covers the full production sequence, not just the forming step:
| Stage | Typical timing | What happens |
|---|---|---|
| Sample order | 5–7 days | Sample production and dispatch |
| Sample approval | Buyer-controlled | Check material, thickness, finish and fit |
| Bulk production | 25–30 days | SUS304 forming, welding, brushing, inspection and packing |
| Freight and customs | Buyer-planned | Add to the 25–30 production days |
The 25–30 days is production time. Freight and customs sit on top of it, so buyers planning around a fixed installation date should work backwards from that date and leave room for shipping. Ordering early costs nothing; ordering late can cost a project its schedule.
Yalan Sink introduces 10+ new designs every year, so buyers planning repeat orders can also ask what is new since their last purchase — a fresh model can be sampled in the same 5–7 day window as an existing one.
What Can Delay Your Order (and How to Avoid It)
Most delays are avoidable, and most come from decisions that arrive after production has started. The common ones:
- Changing specifications mid-production. A different thickness, finish, or size agreed after forming has begun means rework or a restart. Freeze the specification before production starts.
- Late sample approval. Bulk production cannot start until the sample is approved. Review the sample the day it arrives, not the week after.
- Unclear packaging or marking requirements. Export packing, carton marks, and labels should be confirmed with the order, not discovered at dispatch.
- Incomplete order details. Model, thickness, finish, installation style, quantity, and delivery address all belong in the first inquiry. Missing details mean extra rounds of questions before production can be scheduled.
A complete first inquiry — model numbers, material, thickness, finish, quantity, and the delivery schedule — is the single fastest way to hold the 25–30 day window.
MOQ and Cost: What a 50-Piece Order Buys You
No factory publishes a single price for a sink, because cost depends on the specification: a 1.5 mm bowl uses more steel than a 0.7 mm one, a gold finish involves more surface work than a standard brushed finish, and a large double bowl takes more forming time than a compact single bowl. What a buyer can count on is the structure: ordering factory-direct removes middleman margin, and unit economics improve as quantities grow beyond the first 50 pieces.
That makes the first 50-piece order a sensible test. It is large enough to earn factory-direct terms and small enough to limit exposure if a model does not sell as expected. Repeat orders of proven models are where the volume benefit shows.
First-Order Checklist for B2B Buyers
Use this checklist when preparing a first order, and confirm every line with the factory before production is scheduled:

| Item | What to confirm |
|---|---|
| Model | Model numbers and quantities, 50 pieces total per order |
| Material | SUS304 stainless steel only |
| Thickness | 0.7, 1.0, 1.2 or 1.5 mm |
| Finish | Brushed, matte black, gold, or as specified |
| Installation | Undermount, topmount, flush mount, or farmhouse |
| Size | Bowl size and overall dimensions; check the standard kitchen sink sizes guide |
| Certifications | CE, cUPC and ISO 9001:2015 as required by the destination market |
| Packaging | Export packing and carton marking |
| Delivery | Production 25–30 days plus freight, counted back from the installation date |
Buyers can browse the full product range to shortlist models, then contact Yalan Sink with the completed checklist. A complete inquiry gets a faster, more accurate answer than a partial one.
FAQ
What is the wholesale kitchen sink MOQ at Yalan Sink?
The wholesale kitchen sink MOQ is 50 pieces per order. The 50 pieces can be a single model or a mix of sink and faucet models, and samples are available in 5–7 days before the bulk order.
Can I mix different sink models in one 50-piece order?
Yes. The minimum counts the order total. Keep a 50-piece order to two to four models so each model still gets an efficient production setup.
How long do samples take?
Samples take 5–7 days. Approve the sample before bulk production starts, and use it as the reference for material, thickness, finish, and dimensions.
How long does a bulk order take?
Bulk production takes 25–30 days after the order is confirmed. Freight and customs are additional, so plan backwards from the installation date.
Do I need to order faucets separately?
No. Faucets can be part of the same 50-piece order as the sinks, which suits buyers putting together a complete kitchen range.